Confidential Client – Office Building Optimization

Confidential Client – Office Building Optimization

Studies and implementation of optimization controls for multiple office buildings for Genentech.  Energy models were developed to test out the performance of different energy conservation measures.  Pre-construction performance trends were setup by data loggers to record power for compressors and fans.  Gayner Engineers developed detailed sequence of operations for the new optimized controls, including dual-maximum, static pressure reset, CO2 demand ventilation controls for conference rooms, temperature reset, temperature setback, and optimal start.  Implemented new control sequences and post construction performance verification.

Back to Infrastructure and Controls Upgrades